Park Terrace Elementary
 
The west side of Park Terrace was completely reconstructed, moving the classrooms from the center of the wing and reconstructing them against the outside walls. Natural light from the skylights in a widened hallway now flow into the classrooms, which have windows facing the hallway. An enlarged gym will now adequately provide for two simultaneous teaching stations.
Like Woodcrest, the kitchen at Park Terrace has been expanded and the cafeteria has been redefined into a multi-purpose room with greatly expanded window space. In addition, deferred maintenance projects also included a new mechanical system and new carpeting in the classrooms, as well as asbestos abatement and replacement of the plumbing and piping. Next summer, the east wings of both Park Terrace and Woodcrest will be completed in similar fashion.
 
Multimedia

 
 
Park Terrace Phase I
Video Tour
 
Coming Soon
 
 
Building Highlights

  • Move west-end classrooms from the center of the wing and reconstruct against the outside walls
  • Reconstruction project will also result in additional classrooms
  • 20’ wide hallways on the west side of the building will allow for teaching stations such as pull-outs, Title 1
  • Natural light from skylights in the widened hallway will flow into the classrooms which will have windows facing the hallway
  • New regular education classrooms on the west side of building will be approximately 900-950 square feet
  • Deferred maintenance projects will include:
    • refurbished mechanical systems
    • new carpet in classrooms
    • asbestos abatement
    • program incorporated to clean duct work
    • plumbing and piping replacementnew air handling systems incorporate same color palate in all schools
  • Expansion of the parking lot, creating a safer separation of bus and auto traffic
  • Parking lot drainage issues will be corrected
  • Public vestibule at the main entrance. The remodeled entrance will have one set of doors instead of three
  • Addition of vestibules with airlock entries near the kitchen and boiler room areas
  • Expansion of kitchen receiving area
  • Expansion of gymnasium area
  • Modifications to the administrative area
  • Card key access may be used at front entrance and receiving area
  • Lockers incorporated into classrooms
  • Addition of music and art rooms near the new kindergarten classrooms
  • Complete roof replacement by the end of construction projects
  • Stage in gymnasium will be removed to provide additional cafeteria seating
  • Windows will be added in the cafeteria to provide natural light. The cafeteria will become a multi-purpose space. Circular and rectangular tables with chairs will replace the current seating. (This new type of seating will be used in all schools in the district.)
  • Construction costs at Park Terrace will be $6.8 million
Construction Documents

 
Site Plan
 
Park Terrace Site Plan
 
Phase I 2007
 
Park Terrace Phase I
 
Phase II 2008
 
Park Terrace Phase II
 
Main Entrance
 
Park Terrace Main Entrance
 
West Elevation
 
Park Terrace West Elevation